
Plan the work
Lay out full walls on paper first. Decide where panels terminate at corners, switches, windows and built-ins. A sample length helps confirm projection and shadow.
Define the scope
Specify profile numbers or dimensioned drawings, material, build-ups, return details and paint preparation. Crown often requires backing or a defined fastening strategy.
Include the project location, current photos, plans if available, approximate dimensions, desired finish and timing. For renovations, show adjacent surfaces that remain.
What careful installation involves
Installation begins from control lines. Inside corners may be coped or mitred depending on the profile and finish; outside corners need tight assembly and protection.
Review before sign-off
- Check alignment and visual consistency from normal viewing positions.
- Operate every door, drawer or moving component.
- Confirm joints, fasteners and surfaces are ready for the agreed finish.
- Record any deficiencies and who is responsible for correction.
Discuss the details
Send drawings or photos to build@buildershaus.com or call +1 604 761 1518.